Construction Progress

Watching the flagship come together.

An open look at the build-out of the LUX Barber Co. Winter Park flagship — from the shell we started with to the lounge, bar, and nine-station floor taking shape now.

Timeline

Where we are.

  1. Phase 1

    Site Secured

    Winter Park flagship location signed and permitted.

  2. Phase 2

    Demolition & Rough-In

    Interior stripped to the shell. Electrical, plumbing, and HVAC rough-in underway.

  3. Phase 3

    Build-Out

    Framing, millwork, and finishes for the bar, lounge, and nine-station barber floor.

  4. Phase 4

    Fit & Finish

    Collins Comander Series chairs, marble, leather, lighting, and the bar program installed.

  5. Phase 5

    Doors Open

    November 19, 2026 — one week before Thanksgiving.

Renders

The finished room, visualized.

Design renders of the bar, lounge, and nine-station barber floor guiding the build-out.

LUX Barber Co. bar and lounge renderLUX Barber Co. barbering floor renderLUX Barber Co. full shop render

Exterior

The building and its plaza.

Brick, glass, and mature landscaping — the Winter Park address our guests will walk up to.

LUX Barber Co. exterior progress 1LUX Barber Co. exterior progress 2LUX Barber Co. exterior progress 3LUX Barber Co. exterior progress 4LUX Barber Co. exterior progress 5LUX Barber Co. exterior progress 6LUX Barber Co. exterior progress 7LUX Barber Co. exterior progress 8LUX Barber Co. exterior progress 9LUX Barber Co. exterior progress 10LUX Barber Co. exterior progress 11LUX Barber Co. exterior progress 12

Interior Build-Out

The shell becoming the room.

Concrete, exposed structure, and the bones of the bar, lounge, and barber floor.

LUX Barber Co. interior construction 1LUX Barber Co. interior construction 2LUX Barber Co. interior construction 3LUX Barber Co. interior construction 4LUX Barber Co. interior construction 5LUX Barber Co. interior construction 6LUX Barber Co. interior construction 7LUX Barber Co. interior construction 8

Floor Plans

How the room is laid out.

Nine barber stations, a central bar, and a lounge built for gathering.

LUX Barber Co. rendered floor planLUX Barber Co. architectural floor plan

Doors Open

November 19, 2026

Membership interest, private-event inquiries, and press requests are all welcome now.

Lux@Luxbarberco.com